African natural resources and mines is a multi-billion naira iron ore mining company, Nigeria’s first steel manufacturing plant located in Gujeni, Kaduna state, 19 km from Abuja.
The mining plant is situated on over 500 hectares of land with an expected workforce of 2,000 workers made up of Nigerians and 300 expatriates. The plant is under construction and the first phase is about to be completed and will resume operations by January 2022.
A massive national workforce is required and experienced hands are also required to support the Iron Ore Processing Project to run effectively. The iron will then be further processed into steel in Nigeria for the time.
Job Location: Kaduna Nigeria
Urgent Positions required are:
1. Field Engineer
2. Mechanical & Electrical University Graduates
3. Shift Foreman
4. Boiler Field Operator
5. Turbine Field Operator
6. Shift Engineers
7. Fitter Mechanic
8. Electrical Shift Engineer
9. Electrician
10. Instrumentation Technicians
11. Chemist
12. Planning Engineer
How To Apply
Interested Applicants from all parts of Nigeria are eligible to apply.
All applications/CVs should be sent to recruitment.gujeni@anrml.com
Leave a Reply