The Nigerian National Petroleum Corporation (NNPC) is currently embarking on the construction of 40” X 614km Ajaokuta-Kaduna-Kano Gas Pipeline and Stations (AKK). The AKK Pipeline is a section of the Trans-Nigerian Gas Pipeline Network. The Segment 2 scope covering a distance of about 318.66 km of the Trans Nigeria Gas Pipeline and stations was awarded to Brentex CPP Limited for the Engineering, Procurement and Construction of Ajaokuta-Kaduna-Kano (AKK) Gas Pipeline and Stations Project.
As an equal opportunity employer, Brentex CPP Limited welcomes applications for the following positions below to serve on the Ajaokuta-Kaduna-Kano (AKK) Gas Pipeline Project (Segment 2) Operation:
- Senior Heavy Duty Mechanic (Semi Automatic Welding Equipment) at the Nigerian National Petroleum Corporation (NNPC) – Abuja & Kaduna
- Semi – Automatic Welding Specialist at the Nigerian National Petroleum Corporation (NNPC) – Abuja & Kaduna
- Semi-Automatic Welding Instructor at the Nigerian National Petroleum Corporation (NNPC) – Abuja & Kaduna
- Heavy Duty Mechanical Specialist (Gas Pipeline Construction & Automatic Welding Equipment) at the Nigerian National Petroleum Corporation (NNPC) – Abuja & Kaduna
Deadline: 1st January, 2022.
Leave a Reply